Accurately assessing the feasibility of a project and defining the various solutions available can not only save time and money but also provide effective root cause analysis.
In this series of articles, we will speak about an ongoing project we have undertaken for a national snack producer and how our approach to feasibility uncovered an underlying issue.
The national snack producer was in the process of upgrading its oven controls and carrying out a gas safety and reliability project. They were experiencing ever-increasing downtime due to a loss of gas pressure causing gas burner lockouts.
WSP Engineering was chosen to manage the installation of the new oven controls and the gas safety and reliability project. Part of our project management processes is to conduct a feasibility study before work commences to understand the scope and requirements for this business improvement project.
Our engineers attended the site to conduct the feasibility study and, despite this being a new project and environment, through their agility and versatility, were able to uncover an underlying root cause issue in a short space of time.
The feasibility study identified various pressure and flow issues within the facility’s gas network. Unfortunately, the problems identified meant that any new oven controls installed would most likely suffer from the same issues, and the production facility would continue to endure downtime and disruption.
Our team mapped the entire gas network and calculated the gas pressure losses based on the pipe’s width, length, bend and components. We are now fitting temporary monitoring devices to the existing oven controls to verify our calculations and gather data on gas flow and pressure when all the ovens are in use.
Through our feasibility study, we identified issues accurately and began to implement measures to solve the root cause issue. This will save the client from starting unnecessary work, increasing the efficiency of their operation and allowing them to make educated and informed decisions on where and how to invest their budget.
Stay tuned for our next update on this project.
Follow the links below to speak to a team member about your feasibility requirements or to learn more about what we do at WSP Engineering.
More Articles
Offering a wide range of Health and Safety Courses WSP Engineering has taken a significant step forward in our mission
Catching up with our Graduate Engineers As part of WSP Engineering’s vision and strategic business plan aimed at fostering the
Jigsaw Foods Wastewater Treatment Project Conclusion We are pleased to announce the completion and conclusion of the wastewater treatment project
WSP Newsletter Sign Up
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |